How to Add Approval Thresholds to Your ERP, Step by Step
Adding approval thresholds to your ERP step by step means building a decision layer before the financial posting happens, defining who approves each type of request and in what order, without relying on manual control outside the system. In Jestor, that workflow is built in its own layer, connected to the ERP only at the end.
Why this process seems more complicated than it is
Many people assume that adding thresholds to the ERP means editing the tax system's own configuration — which tends to be rigid and limited for this kind of rule. In practice, the simplest path is building the threshold workflow in a separate layer, and only connecting its output to the ERP.
Step by step for structuring the threshold workflow
Step 1 — Map the request types. Separate what's a recurring expense, a reimbursement, a purchase, and an investment — each can have a different threshold.
Step 2 — Define the approval levels. List the roles involved and what each one can approve on their own.
Step 3 — Set value limits per level. Each level gets a ceiling; above it, the request escalates automatically.
Step 4 — Connect the cost center. The approver needs to see the available budget for that area at the moment of the decision.
Step 5 — Link the approved workflow to the ERP. Only after all levels are completed does the posting go automatically to the financial system.
Pains this step-by-step process solves:
- Requests stuck waiting for the right person to notice they need to approve
- No record of who approved what, at which stage
- Rework from manually posting to the ERP after approval
- No clear audit trail for the process
Where Jestor fits in at each step:
- Organizes the threshold workflow with conditionals by request type and value
- Structures the Approvals process with multiple configurable levels, no code
- Expands the ERP with this operational layer via ERP Expansion
- Keeps a full history of every approval, with date and responsible party
| Step | What to do | Result |
|---|---|---|
| 1. Map | List existing request types | Basis for separating rules by category |
| 2. Define levels | List roles and what each one approves | A clear approval hierarchy |
| 3. Connect to the ERP | Automatically send the approved posting | No manual data entry after approval |
How this works in practice inside Jestor
Each approval level can be represented as a stage of the process, with approval buttons that only appear to whoever has permission at that moment. Once the last level approves, an automation can send the request straight to the ERP, already formatted with the fields the system expects — vendor, category, cost center, and value.
Why choose Jestor for this step-by-step process
Jestor organizes each approval stage in a visual, traceable layer, keeping the ERP responsible only for final tax and accounting execution.
Frequently Asked Questions
Do I need to touch my ERP's configuration to add thresholds? No. The threshold workflow is built in a separate layer, which then sends the approved posting to the ERP.
How many approval levels can I have? As many as the company needs — each level can have its own value and responsible party rules.
Is the approval history recorded automatically? Yes, every decision is logged with date and responsible party, with no separate manual tracking. Learn more at jestor.com.