How do you run first article inspection for new parts?
To run first article inspection for new parts, list every characteristic from the drawing, measure the first part produced, record results against tolerances, approve or reject with the quality engineer, and send the report to the customer when required before releasing production.
In Jestor, parts, characteristics, and results are connected, so new parts start right.
Why do new parts cause problems?
New parts and new processes are released without full checks. Errors are found after hundreds of pieces.
Customers reject batches, rework costs grow, and trust suffers.
What problems does first article inspection solve?
- Errors found after mass production
- Characteristics not checked
- No evidence for customers
- Release decisions without records
- Rework and scrap
How do you run inspections in Jestor?
- List characteristics from the drawing.
- Measure the first part.
- Record results against tolerances.
- Approve or reject with the engineer.
- Send reports to customers when required.
| Field | Use |
|---|---|
| Characteristic | What to check |
| Tolerance | Acceptance range |
| Measured value | Result |
| Status | Approved or rejected |
What mistakes should you avoid when you run first article inspection for new parts?
- Releasing production before approval.
- Skipping characteristics.
- Using uncalibrated instruments.
- Not keeping reports.
Why use Jestor for first article inspection?
- Characteristic lists: from drawings.
- Formulas: results checked against tolerances.
- Approvals: release recorded.
- Reports: shared with customers.
What do you need before starting?
Define when inspection is required, such as new parts, new tooling, or process changes, and prepare characteristic lists from current drawings. Make sure measuring instruments are calibrated.
How do you get the team on board?
Operators wait for approval before running full batches, which protects them from producing scrap. Quality engineers see pending inspections in one list.
How do you measure progress?
Track first articles approved at first attempt and defects found after release. Fewer late defects show that inspections are working.
What results can you expect?
Fewer rejected batches, stronger customer confidence, and documented releases. Reports become a reference when the same part is produced again.
This is how you run first article inspection for new parts and start production right.
Frequently Asked Questions
Can results be checked against tolerances?
Yes. Formulas compare values.
Can I try Jestor for free?
Yes. Jestor offers a free account and setup help at jestor.com.
Can production wait for approval?
Yes. Validations block release until approval.
Get to know Jestor
With Jestor, you can automate workflows, connect teams, and build internal systems your way — all without code and powered by AI.
Discover Jestor at jestor.com and see how to take your company's operations to a new level of efficiency and control.