How to build a gauge chart with calculated values

A gauge chart with calculated values computes its own number instead of reading a prepared field. In Jestor, you set a minimum, a maximum and a calculation, and the chart shows progress toward the target directly, without a separate indicator feeding it.

Why gauges were limited before

A gauge is the natural way to show progress toward a goal. Its weakness was always the input: it could only display a value that already existed somewhere as a field.

That meant building a calculated field first, purely so the chart had something to read. Two objects to maintain for one number.

What calculating inside the chart removes:

  • Auxiliary fields created only to feed a visual
  • A calculation that has to be updated in two places
  • Delay between the data changing and the chart reflecting it
  • Confusion about which field the gauge is actually reading

What a gauge needs to be configured

SettingWhat it definesExample
Minimum valueWhere the scale startsZero
Maximum valueWhere the scale endsThe monthly target
Calculated valueThe result being measuredSum of closed deals
TargetThe reference being pursuedRevenue goal
ProgressPercentage of the target reachedDerived automatically

Step by step to build one

  1. Activate build mode on the app holding the panel.
  2. Add or edit the gauge chart.
  3. Set the minimum and maximum, which define the scale.
  4. Choose the calculated value option instead of pointing at a field.
  5. Define the calculation, such as the sum of a value on records in a given stage.
  6. Check the progress percentage, which is derived from the calculation and the maximum.

Where gauges work and where they mislead

A gauge is excellent for a single number moving toward a single target. It is poor at showing a trend, a comparison or a distribution, because the shape encourages reading one thing. Use it for the monthly goal, and a bar or line chart for everything else.

  • Calculation inside the chart: no auxiliary field to maintain
  • Scale defined explicitly: minimum and maximum under your control
  • Progress derived automatically: percentage calculated from the target
  • Best for goals: one metric, one target, one clear read

Frequently Asked Questions

Do I need a separate field to feed the gauge?

No. The gauge can calculate the value itself. See jestor.com.

Can I set my own scale?

Yes. The minimum and maximum values are configurable.

Is the progress percentage automatic?

Yes. It is derived from the calculated value against the maximum.

Video Tutorial: Step by Step

With Jestor, you can automate workflows, connect teams, and build internal systems your way, all without code and powered by AI. Discover Jestor at jestor.com and see how to take your company's operations to a new level of efficiency and control.

Read more