# How to configure a Kanban board that stays readable
- URL: https://blog.jestor.com/kanban-board-that-stays-clean/
- Published: 2026-09-16T18:49:43.000Z
- Updated: 2026-09-16T18:49:43.000Z
- Author: Bruno Bannach

Good **Kanban board configuration** means each stage shows only the fields that matter at that stage, and colors distinguish cards without anyone tagging them by hand. In **Jestor**, both are configured per phase, so a negotiation card and a closing card can display completely different information.

## Why boards get unreadable as they grow

A board usually starts clean and then accumulates. Someone adds a field that matters in one stage, and it appears on every card in every column, including the ones where it is meaningless.

Within a few months the cards are dense, the columns scroll and nobody can scan the board at a glance.

What clutters a board:

- The same fields displayed in every stage regardless of relevance
- Cards carrying information that only matters at the end
- Color used decoratively rather than to signal something
- Manual tags that people forget to apply
- Too much detail visible before a decision needs it

## What to show at each stage

| Stage         | What to display                  | What to hide              |
| ------------- | -------------------------------- | ------------------------- |
| Qualification | Source, contact, potential value | Contract details          |
| Negotiation   | Full detail, next step, deadline | Post sale fields          |
| Closing       | Contract and signature status    | Early qualification notes |
| Delivery      | Owner and delivery date          | Commercial history        |

## Step by step to configure it

1. **Create the board** from the table holding the records.
2. **Define the stages** so each one represents a real state of the work.
3. **Choose the fields per stage**, showing only what a person needs to decide there.
4. **Set the conditional color rules**, tying color to a field value rather than a manual tag.
5. **Configure sorting and filters** so the most relevant cards surface first.
6. **Review after a month** and remove any field nobody actually reads.

## Why conditional color beats manual tagging

A color someone has to apply is a color that stops being applied. A color derived from a field value stays correct forever, because it reflects the data rather than someone's diligence.

- **Color by rule:** cards differentiate themselves based on their own values
- **Fields per stage:** relevance changes as work progresses, and the board follows
- **Created in one click:** a board can be generated from any table
- **Customizable throughout:** colors, displayed fields, sorting and filters

## Frequently Asked Questions

### Can different stages show different fields?

Yes. Each phase can display its own set of fields on the card. See [jestor.com](https://www.jestor.com/?ref=blog.jestor.com).

### Do I have to color cards manually?

No. Conditional rules apply color based on the values in the record.

### How do I create a board from existing data?

A Kanban can be created in one click from any table you already have.

## Video Tutorial: Step by Step

With **Jestor**, you can automate workflows, connect teams, and build internal systems your way, all without code and powered by **AI**. Discover Jestor at [jestor.com](https://www.jestor.com/?ref=blog.jestor.com) and see how to take your company's operations to a new level of efficiency and control.