# What is a good way to track machine setup and changeover times?
- URL: https://blog.jestor.com/machine-setup-changeover-times/
- Published: 2026-11-03T20:06:45.000Z
- Updated: 2026-11-03T20:06:45.000Z
- Author: Bruno Bannach

A practical way to **track machine setup and changeover times** is to record start and end of every changeover with machine and product pair, break the setup into steps, identify the longest steps, plan improvements to reduce them, and track trends over time.

In **Jestor**, machines, changeovers, and improvements are connected, so setup time becomes capacity.

## Why do changeovers waste capacity?

Changeovers stop machines. Times are rarely measured.

Long setups lead to large batches, more stock, and less flexibility to serve customers.

## What problems does setup tracking solve?

- Setup times unknown
- Capacity lost
- Large batches
- No improvement data
- Variation between shifts

## How do you track setups in Jestor?

1. **Record start and end** with buttons.
2. **Link machine and product pair**.
3. **Break setups into steps**.
4. **Plan improvements** for long steps.
5. **Track trends** by machine.

| Indicator          | Use               |
| ------------------ | ----------------- |
| Average setup time | Capacity lost     |
| Variation by shift | Standardization   |
| Longest steps      | Improvement focus |
| Setups per week    | Flexibility       |

## What mistakes should you avoid when you track machine setup and changeover times?

- Measuring only once.
- Ignoring variation between shifts.
- Improving without standards.
- Using data to blame operators.

## Why use Jestor for setup tracking?

- **Buttons**: start and end recorded.
- **Formulas**: averages calculated.
- **Actions**: improvements tracked.
- **Dashboards**: trends visible.

## What do you need before starting?

Choose the machine with the most frequent changeovers and record every setup for a month. Agree on what marks the start and end of a setup, such as last good part and first good part, so measurements are comparable across shifts and machines.

## How do you get the team on board?

Operators often know how to shorten setups. Involving them in analyzing steps creates better standards and ownership. Celebrate shorter setups publicly.

## How do you measure progress?

Compare average setup times before and after improvements. Shorter setups allow smaller batches and faster response to orders.

## What results can you expect?

More available capacity, less stock, and more flexibility for customers. Standardized setups also reduce errors after changeovers.

This is how you track machine setup and changeover times and gain capacity without new machines.

## Frequently Asked Questions

### Can setups be recorded with one tap?

Yes. Buttons record start and end.

### Can I try Jestor for free?

Yes. Create a free account at [jestor.com](https://www.jestor.com/?ref=blog.jestor.com).

### Can variation by shift be seen?

Yes. Dashboards group by shift.